Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8538436
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | Supply the renovation process on how to improve the budget |
Published: | 2011-09-21 |
Validity: | 30 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | In the renovation process, many owners will encounter such a problem: the renovation budget offer can not read, can not see inside the water, even knowing that a problem, there is no way to start, making the decoration is the cloud and in the fog years. Decoration company budget usually housing allocation for the unit, we have to analyze how audit budget price. Dining room, water and electricity decoration content should include: 1) the laying of floor tiles - the main material is the floor tile, DPM for cement, sand, water and glue, the price is Vice materials 10/M2, of which the main material per square algorithm is 1 / ( A * B), then multiplied by the price of each brick (a lot of decoration company into a phenomenon, referring to the 11.3 count 12, which is unreasonable) loss is 5%. 2) Make the baseboard should be skirting the grassroots level (9% board + splint) + baseboard lines + paint + labor prices. 3) the top of the wall surface of latex paint, it should be based processing + latex paint surface primer + artificial price. 4) gypsum board ceiling, according to the projected area of ??the billing: DPM + artificial price. 5) door installation, should include doors and doors subsidiary part of the installation (eg, hinge, hinges, door locks, door smoking) + paint + labor. 6) a variety of cabinet and partition, decorative wall production, including grass-roots framework + hardware installation + paint + labor. 7) The installation of water and electricity: the cost is divided into three parts: DPM - ray tube, wire, etc.; main material - switches, sockets, lighting, sanitary ware, etc.; labor costs, local standards are not the same. Installation of water and also includes kitchen and bathroom equipment installation. Most of the renovated house construction area prefetch fees, construction works are completed after the balance sheet. |
Admin>>>
You are the 7415 visitor
Copyright © GuangDong ICP No. 10089450, Chongqing Niko Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7415 visitor
Copyright © GuangDong ICP No. 10089450, Chongqing Niko Decoration Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility